The R & D Team The R & D Team

JTU always puts technological innovation in the first place, strengthens the technical cooperation between universities and research institutes, and invites the professional technicians of the mainframe manufacturers to introduce and cultivate high-quality design and research talents, so that the company can continuously develop technology leadership. Competitive products!

Mei Sheng Feng Senior Engineer Chairman

After graduating from the steam turbine of Xi'an Jiaotong University in 1984, he entered Hangzhou Steam Turbine Co., Ltd. (referred to as Hangqi), engaged in steam turbine control system design, research and development, on-site commissioning, etc. He used to be the director of the steam turbine control room, the deputy director of the steam turbine research institute, and the spare parts office. Director, Deputy Director of the General Manager Office, etc. In 2004, he entered the Hangzhou Steam Turbine Machinery Equipment Co., Ltd., a subsidiary of Hangzhou Auto, as the Minister of Technical Quality Department. He is engaged in steam turbine renovation and engineering implementation. He has more than 30 years of experience in steam turbine professional technology, and has hosted and participated in hundreds of steam turbine regulation system transformation cases. Participate in the design and development of dozens of series of turbine supporting products, hundreds of varieties.

Linghui Ruan Electrical Engineer Automation engineer

He is currently the deputy chief engineer of Zhejiang Jieteyou Power Machinery Co., Ltd. He has been engaged in steam turbine control system for more than 10 years. He was responsible for participating in the localization of electro-hydraulic converters, and participated in the design of control systems for condensing and back-pressure drive steam turbines. R & D design electro-hydraulic converter, as well as on-site installation and commissioning work.

Steam turbine intermediate engineer Wentao Hong

Now he is the technical manager and deputy chief engineer of Zhejiang Jieteyou Power Machinery Co., Ltd. He has been engaged in steam turbine control system for more than 10 years. He was responsible for the design and modification of steam turbine control system, and participated in the extraction of steam speed shut-off valves, electric discs and other products. The design work, while also participating in the development of high-voltage systems, as well as on-site installation and commissioning work.

0573-88223782
No. 308, Hangfu Road, Chongfu Town, Tongxiang City, Zhejiang Province
jtu@jtupower.com